Work Package 5
Drinking water delivery and supply

Responsible
Fraunhofer Application Centre Systems Technology Ilmenau, Dept. Water (FhAST)

Participating
Ingenieurbüro Dr. Pecher und Partner (P&P)

Objectives
The main goals of this work package are to establish the ecological, economic sustainable and optimal drinking water supply in the model region (city of Darkhan), to determine the magnitude of the potential impact due to the improvement of the critical environmental situation in the urban and rural region, to supply the Ger areas (the traditional dwelling of the nomads in Mongolia) located in the surround of the city core Darkhan with drinking water and to suggest most suitable control measures with an optimum of cost benefits. By using the software products HydroDyn and POS, the development in FhAST will be determined by the vulnerabilities and bottlenecks of the distribution networks. In addition an optimal planning for the construction and reconstruction of the supply networks and proposals for optimal management of the daily process operation will be presented. Thereby the most immense costs of reconstruction of the network and of running processes can be minimised.
Essential results and events

September 2006
  • Acquisition of data, maps and materials of the drinking water supply networks of the city Darkhan
  • Analysis and identification of the problems and technological systems as well as administration of management
  • Modeling, calibration and planning for simulation of the drinking water supply systems
  • Measurements, modification and further model calibration

December 2006
  • Reactivation of contacts and exploratory talks with the Mongolian ministries, administrations and selected project cooperation partners

March 2007
  • Signing of the agreement between the Fraunhofer AST Ilmenau and the Mongolian project partners, drinking water supply and sewerage company of city Darkhan (USAG), the Mongolian University for Science and Technology Darkhan (MUST) and the Environmental protection agency of municipality of Darkhan-Uul aimag.
  • Launching of the project office at the MUST Darkhan
  • Works with HydropDyn
    - Data acquisition and preparation
    - Modeling of the main pipe lines of the drinking water supply system
    - Analysis of the consumption demand
  • Engagement of local staffs for supporting minor works
  • Lectures and seminars for students from different faculties, like Construction Technology, Water Technology, Computer science and Mathematics of MUST Darkhan.

May 2007
  • Poster presentation about the MoMo-Project on the Sustainable Neighbourhoot from Lisbon to Leipzig L2L in 2007 May in Leipzig
  • Interview about the MoMo project goals and subjects for students of the faculty Media Technology of the TU Ilmenau

June 2007
  • Calibration of the data, parameters and model
  • First simulation of the drinking water supply networks with main pipe lines
  • Installation of measurement devices
  • Teaching and training of local staffs
  • Modeling and simulation of the drinking water supply networks of the city Darkhan with main pipe lines, pumps and tanks.
    - Import of the drinking water supply networks from the AutoCad-File
    - Manual modification of the model
    - Relating of water consumption demands
    - First simulation
  • Cooperation with ARTE-TV team for film shooting about the MoMo Project in Mongolia

September 2007
  • Participation in the 52nd International Scientific Colloquium at TU Ilmenau

    Papers:
    Th. Westerhoff / B. Scharaw: Optimised Control of the drinking water supply system of city Darkhan in Mongolia, Proc. 52nd International Scientific Colloquium. Universitätsverlag Ilmenau. Vol. II. pp. 41-46 Altantuul Khatanbaatar: Deneed desinging integrated urban water management in cities of Mongolia, Proc. 52nd International Scientific Colloquium. Universitätsverlag Ilmenau. Vol. II. pp. 17-22

November 2007
  • Modification of the first model of the drinking water supply system of city of Darkhan in software HydroDyn in cooperation with local employees and students
  • Identification, analysis and allocation of water consumption demands (large, small, public and private) to the node points in HydroDyn by means of excel table from USAG.
  • Further calibration of the model

January 2008
  • Results of the simulation of the drinking water supply system
    - the drinking water supply system of the city Darkhan has many weak points - high leakage of water - Ineffectual pumping processes (very high energy consumption) - Necessities of the optimisation of the processes - Modification of the drinking water networks for the yurt area in outskirts of town - water hammer problem in the pipe between pumping stations 1 and 2
  • Model calibration of the drinking water supply system of the city of Darkhan in cooperation with MUST and USAG Darkhan
  • Teaching and training of the scientific works and results in fields of water management, drinking water supply, controlling of pumps, system technology and measurements
  • Information and Synergy from the GTZ-Projects “The thermotechnical rehabilitation of pre-cast panel building" und “Ecological Sanitation System"

March 2008
  • Further calibration of the drinking water supply system
  • Scenarios with different water consumptions
  • Implementation of measurements for calibrations (ISPESI, Ultrasonic UFM 005) in cooperation with local staffs of USAG Darkhan
  • Simulation for the estimated number of inhabitant for 2020
  • The drinking water supply network requires reconstruction and does not meet the technical requirements
  • Translation of the user interface of HydroDyn in Mongolian language
  • Participation in the visit in Mongolia from Feb. 25.-March 05.2008 for preparing the status seminar in May 2008 in Ulaanbaatar and consultation with Mongolian authorities and IFI’s (WB, ADB KfW)

May 2008
  • Participation in the status seminar in Ulaanbaatar (20. bis 22. May 2008) with the presentation about current state of WP5 und 6
  • Establishment of further required working steps by analysis and simulation results
  • sustainable monitoring program for protecting the drinking water supply of the city Darkhan with acceptable quality
  • Identification of factors for ageing and wastage of equipments in drinking water supply system
  • Optimising pump scheduling for minimisation of energy costs
  • Model based simulation of optimised positioning of sensors for minimisation of leakages
  • Project presentation on the fair IFAT 2008 in München in May 5. - 9. 2008
  • Project presentation on the environment forum „Deutschland und China – Gemeinsam in Bewegung“ in Chongqing China May 9.-17. 2008
  • Start of the works for interfaces to WP 4

September 2008
  • Dr. Sharaw and Dr. did an 3-day monitoring and analysis program for quality assurance in drinking water extraction in mining areas. Main focus of attention was the identification of heavy metals and interviews with the relevant people.
  • Later analysis made by FUGRO Consult GmbH in Germany shows that all the investigated heavy metal concentrations, except in Bor Tolgoi, are within the limitations of Drinking Water Ordinance.
  • In cooperation with other partners a complete balance of drinking water supply in city Darkhan by compairing water- wastewater- and pumping data of the WWTP was developed.
  • further calibration of the HydroDyn water supply network model togeteher with USAG. missing demand data have been added when they were known or estimated by population when they were unknown. A good match with the water balance was found.
For capacity building Fraunhofer AST held some lectures and practical trainings for control engineering, simulation, optimization, quality control and monitoring at the MUST in Darkhan. Further there were two fieldworks with about 20 students of MUST Darkhan at the WWTP of city Darkhan. MUST makes a contribution to creation of a concept for drinking water supply and wastewater treatment in the ger areas of Darkhan. MUST gets a partial payment for that from Department of Education, Culture and Science of Mongolia. Prof. Tsevel hands over a letter of recommendation for further worksteps with MoMo project.


October 2008
  • Publication for MoMo-Projekt and the conference in Ulan-Bator in the german newspaper "Thüringer Allgemeine"

December 2008
  • additional screnario calculations (GEO4) have been made with the HydroDyn network model andalysed
  • Extension of HydroDyn with an optimization plugin for calculation of ene energy minimized pump scheduling
  • no informations from USAG about the positions of water hydrant in the network
    Extension of HydroDyn with Plugin for calculation of hydrant rating curves
  • there are still missing datas which has to be aquired together with the mongolian partners
    - exact pump caracteristics ( at the moment interpolated from the working point)
    - Positions of leakages in the last years. The amount of leakage is known
    - positions of hydrants and their parameter within the network